Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/asala/domains/asalaalkhaleej.com.sa/public_html/wp-includes/functions.php on line 6114
construction – الصفحة 2 – Asalaalkhaleej

المقاوالت واإلنشاءات العامة

تبوك مول

Region: Tabuk Owner: Qassim Municipality. Value: 160.000.000 SAR Duration: 3 years. Project Details About the Project Establishing a commercial mall for dates on an area of 12,000 square meters, consisting of two floors, ground and first.

هايبر التمور ببريدة

Region: Qassim Owner: Qassim Municipality. Value: 42.000.000 SAR Duration: 24 months. Project Details About the Project Establishing a hypermarket on the ground floor with an area of 6,000 meters, and a games and restaurants area on the upper floor on an area of 6,000 meters.

سوق التمور ببريدة

Region: Qassim Owner: Qassim Municipality. Value: 49.000.000 SAR Duration: 3 years. Project Details About the Project Establishing a commercial mall for dates on an area of 12,000 square meters, consisting of two floors, ground and first.

إسكان المشرقية

Region: RiyadhOwner: Ministry of Housing.Value:21.000.000 SARDuration: 24 months. Project Details About the Project Construction of 34 villas east of Riyadh in the Levantine complex.

  • 1
  • 2
arAR